| Flow Rate (scfm) | In/Out Connection | Separator Size | Max PSI | Max Operating Temp. (F) |
Price
Financing
|
|
|---|---|---|---|---|---|---|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
190 | 1/2" NPT | 05W | 725 PSI | 140 |
$915.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
1720 | 2" NPT | 20W | 725 PSI | 140 |
$2,184.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
30 | 1/2" NPT | 04W | 232 PSI | 140 |
$254.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
30 | 1/2" NPT | 04W | 232 PSI | 140 |
$479.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
125 | 1" NPT | 07W | 232 PSI | 140 |
$393.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
125 | 1" NPT | 07W | 232 PSI | 140 |
$634.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
450 | 1 1/2" NPT | 20W | 232 PSI | 140 |
$1,246.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
440 | 3/4" NPT | 07W | 725 PSI | 140 |
$928.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
- | - | - | - | - |
$3,397.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
100 | 3/8" NPT | 04W | 725 PSI | 140 |
$463.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
1720 | 2" NPT | 20W | 725 PSI | 140 |
$1,943.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
600 | 1" NPT | 10W | 725 PSI | 140 |
$1,413.00
|
Shop Oil/Water Separators
Ensure clean condensate discharge and stay compliant with environmental regulations using our high-performance oil-water separators. Designed for compressed air systems, these units efficiently separate oil from water, preventing pollution and protecting downstream equipment. Available in various capacities and configurations to meet the needs of industrial, automotive, and manufacturing applications.